
Substrate and preparation
The substrate must be dry, firm, clean and free of grease and dust. Shake well before use.
Processing
Apply cold or hot with a brush, at room air temperatures above 15 °C. Allow to soak in, polish in with a pad after a contact time of 1-24 hours. Intermediate drying is not possible as there is no surface dryer.
Drying time
At 23 °C and 50 % relative humidity 24 hours. The supply of warm air considerably shortens the drying time.
Consumption
1. Apply 10-15 ml/m², considerably less or more depending on the absorbency and surface condition of the substrate. Stir well. Carry out a test coat!