
Processing
The substrate must be dry, clean, solid and free of dust and grease. Brushing, rolling (use a short-pile roller). Room and surface temperature above 15 °C. Paint low to normally absorbent plaster, concrete, cement, chipboard, gypsum fibreboard, metal and polystyrene boards with one full coat. Paint highly absorbent plaster, gypsum plasterboard, insulating fibreboard etc. twice. Check adhesion on non-absorbent substrates.
Drying time
At 20 °C/50-55 % relative humidity: Dust-dry after 8-10 hours, can be painted over with Insulating Primer after approx. 24 hours. Can be recoated with wool plaster after approx. 48-72 hours. For two coats with Insulating Primer after 4 days at the earliest. Ensure good ventilation!
Consumption
Do not exceed 100 ml/m² per coat.