
Substrate and preparation
The substrate must be dry, solid and absorbent. If in doubt, apply a test coat and, if necessary, treat with LEINOS Deep Sealer 620 prime.
Processing
Always stir well before use and during application. Apply the paint evenly with a roller, brush or flat brush and spread in all directions. As a rule, 1 coat is sufficient. Ventilate well during application and drying time.
Drying time
At 20 °C and 50 % relative humidity: Approx. 6-12 hours.
Consumption
1 litre is sufficient for approx. 4-4.5 m².