
Substrate and preparation
The substrate must be chemically neutral, dry, clean, free of grease and dust, and free of penetrating substances. Highly absorbent, unstable substrates and sanding plasters may need to be treated with LEINOS Deep Sealer 620 be primed.
Processing
Brushing, rolling. Room and surface temperature above 15 °C. Once completely dry, it is an ideal substrate for coloured design using the glazing technique and associated products Varnish Binder 646and the Pigment Concentrates 668.
Drying time
Approx. 16-24 hours. Completely dry and loadable after approx. 1 week. This system requires sufficient amounts of atmospheric oxygen for drying. Therefore, ensure good ventilation, e.g. with a fan in stagnant air, to avoid odours.
Consumption
Approx. 200-300 ml/m² per application, may vary depending on the absorbency of the substrate.